My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4987
>
2200 - Hazardous Waste Program
>
PR0513935
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:58:13 PM
Creation date
6/3/2020 9:21:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0513935
PE
2227
FACILITY_ID
FA0003969
FACILITY_NAME
PEP BOYS #711
STREET_NUMBER
4987
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416027
CURRENT_STATUS
01
SITE_LOCATION
4987 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0513935_4987 WEST_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Pep Boys#711 <br /> time during the use of the tank system; The secondary containments for the tank <br /> (secondary or outer tank)is designed to prevent migration of wastes into the soil, <br /> groundwater and surface water. The tank is double walled. <br /> (2)capable of detecting and collecting releases and accumulated liquids until the <br /> collected material is removed. The tank is checked daily for leaks by Pep Boys <br /> employees,and an inspection log is kept. <br /> (c)To meet the requirements of subsection(b)of this section,secondary containment systems <br /> shall be at a`minimum: <br /> (1)constructed of or lined with materials that are compatible with the waste(s)to be <br /> placed in the tank system and shall have sufficient strength and thickness to prevent <br /> failure due to pressure gradients(including static head and external hydrological <br /> forces),physical contact with the waste to which they are exposed,climatic conditions, <br /> the stress of installation,and the stress of daily operation(including stresses from <br /> nearby vehicular traffic);The secondary containment is compatible with the wastes <br /> stored in the tank. The tank is double walled. <br /> (2)placed on a foundation or base capable of providing support to the secondary <br /> containment system and resistance to pressure gradientsabove and below the system,' <br /> and capable of preventing failure due to settlement,compression,or uplift;The <br /> foundations are reinforced concrete capable of providing adequate support to the <br /> tank. <br /> (3)provided with a leak detection system that is designed and operated so that it will <br /> detect the failure of either the primary and secondary containment structure or any <br /> release of hazardous waste or accumulated liquid in the secondary containment <br /> system within 24 hours,or at the earliest practicable time if the existing detection <br /> technology or site conditions will:not allow detection of a release within 24 hours;The <br /> tank is checked daily for'leaks by Pep Boys employees,and an inspection log is kept. <br /> (4)sloped or otherwise designed or operated to drain and remove liquids resulting <br /> from leaks,spills,or precipitation.Spilled or leaked waste and accumulated <br /> precipitation shall be removed from the secondary containment system within 24 <br /> hours,orin as timely a manner as is possible to prevent harm to;human health orthe <br /> environment,If removal of the released waste or accumulated precipitation cannot be. <br /> accomplished within 24 hours.The tank is checked daily by Pep Bays employees and,an <br /> inspection'log is kept Any accumulated liquids are removed immediately. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.