Laserfiche WebLink
• 1 <br /> 2..5The primary tank shall be mounted within the secondary containment cabinet by means <br /> of at least four(4)stabilizing brackets to prevent the primary tank from shifting. <br /> 2.6" The primary tank shall be placed within the secondary containment cabinet with a <br /> minimum of 3"visual clearance around all sides to allow for 100%visual inspection. <br /> 2.7 The exterior of the primary tank shall be cleansed of foreign material, and coated with a <br /> corrosion resistant industrial paint(3 to 5 mils dry film thickness). <br /> 3.0' ENVIRONMENTAL TANK ENCLOSURE`. <br /> 3.1 The Environmental Enclosure (secondary leak containment tank) shall be rectangular in <br /> design and constructed with a minimum 12 ga.steel. All welds shall be full penetration. <br /> 3.2 The Environmental Enclosure shall be separate from the primary tank, and shall not be <br /> welded or attached to the primary tank in any fashion. <br /> 3.3 The secondary leak containment tank shall completely enclose the primary tank and all <br /> operating equipment(360" radius), providing secondarycontainment to the primary tank <br /> and operating equipment. It shall be sized to contain 110% of the primary tank storage <br /> capacity: <br /> 3.4 The inside bottom of the secondary tank shall be fitted with a minimum of two(2) raised <br /> steel channels (a minimum of 2" in height), to support the primary tank above the <br /> secondary tank floor. <br /> 35' The secondary tank shall be supported by two(2),4"high steel support feet channels with <br /> integral anchoring holes to maintain ground clearance for better anchoring to concrete <br /> foundation. <br /> 3.6 The secondary tank shall;contain a removable, locking roof that provides at least 30" of <br /> clearance from the top of the primarytank to the bottom of the roof. <br /> 3.7 The secondary containment cabinet shall contain louvered vents on the cabinet,which is <br /> above the level of the primary tank. These vents shall provide a minimum of 20" of <br /> venting capacity. <br /> 3.8 The secondary containment cabinet shall contain a knock-out hole above the primary <br /> tank level to provide for the working vent installation. Internally threaded couplers for air <br /> supply hose(1/21 and product suction(3/4")shall be welded into the side of the cabinet <br /> above the top of the primary tank, so that the respective hoses are easily installed, and <br /> contractors do not Have to create any hole in the side of the cabinet. The cabinet shall <br /> not be drilled or penetrated, or in any way destroy the integrity of its containment <br /> capacity. <br /> 3.9 The secondary containment cabinet shall include',a hinged, locking security door with <br /> viewport for the product level gauge and OPTIONAL annular space leak detection gauge, <br /> and shall be mounted;on,a removable door frame,at or above the level of the primary tank. <br /> This will provide.access to the components for service or extraction operations. The <br /> removable door frame shall allow for easy replacement of the door and frame if they are <br /> damaged during operating procedures. <br /> 3.10 The interior surface of the.secondary containment cabinet shall be cleansed of foreign <br /> material, and,coated with a corrosion resistant industrial paint (3 to 5 mils dry filen <br /> thickness). The exterior surface of the secondary containment cabinet shall be,cleansed <br /> 2 <br /> March 2oo9 •Mopyrit N,2019+06niainmord Sotutians,Inc. •AIIA19hs Reserved • Pub.No.Sw550/8 <br />