My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4987
>
2200 - Hazardous Waste Program
>
PR0513935
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:58:13 PM
Creation date
6/3/2020 9:21:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0513935
PE
2227
FACILITY_ID
FA0003969
FACILITY_NAME
PEP BOYS #711
STREET_NUMBER
4987
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416027
CURRENT_STATUS
01
SITE_LOCATION
4987 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0513935_4987 WEST_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6--A <br />Lesson Title Safety ScreenI35. <br />Learning Unit Title The Buddy System (continued) <br />Image Large, silver lug nut Audio <br />Content Block. Sidebar <br />Here's how it works. <br />For any vehicle that has a wheel removed or fluids changed, a buddy check must be done. <br />This guarantees a quality job. And it prevents a wheel off, fluid out or no brakes. <br />When you finish your work on a vehicle—before you start it up—call over another employee. <br />They are your buddy for this job. <br />They must torque check at least two lug nuts manually. Initial the work order. <br />They must check any fluids that were replaced. Initial the work order. <br />They must check for leaks. <br />They must check all brake parts to see if they are installed correctly. Initial the work order. I <br />Activity <br />Flash # S Flow Chart <br />Header: Ready to Go <br />An installer finishes a tire rotation. He needs to take these steps in order before pulling the car out of the garage. <br />Step 1 - Get a Buddy -Check of lugs, Step 2 - Initials on work Order Step 3 - Start car, Step 4 - Blow Horn, Step 5 <br />- Back out slowly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.