Laserfiche WebLink
0 • <br /> Recovery for Addison, Baltimore, Edenton, or Gallatin <br /> If the facility is non-operational,follow these steps: <br /> 1. Contact employees and establish communication network <br /> 2. Meet with Branch Management for tasks& responsibilities <br /> 3. Evaluate building/facility, lease alternate space as needed <br /> 4. Establish data processing abilities <br /> 5. Perform physical inventory at plant, packaging vendors, <br /> and offsite storage locations. <br /> 6. Generate an NRP report to determine requirements <br /> 7. Generate purchase orders for all requirements <br /> 8. Assess status of all equipment <br /> 9. Repair equipment where practical <br /> 10. Purchase used/new equipment as necessary <br /> 11. Evaluate and determine level of automation <br /> 12. Determine workforce requirements <br /> 13. Hire and train new employees as necessary <br /> 14. Work with branches to optimize existing inventory <br /> ADDISON and BALTIMORE Formulation Records-Copies of adhesive product formulations are stored in <br /> Pleasanton, CA, and electronically in the Item Master. The contact information for our raw material <br /> vendors can be found in the Vendor Masterfile for Br51 (Addison)and BR97 (Baltimore). <br /> GALLATIN Raw Materials-The contact information for our raw material vendors can be found in the <br /> Vendor Masterfile for Br71. The Manufacturing Ops group can access product formulation and raw <br /> material vendor information. <br /> EDENTON—In addition to our Edenton truss plate manufacturing,we are producing some high volume <br /> truss plate sizes in our Stockton, CA facility. <br /> F <br /> __ j tee <br /> CONFIDENTIAL- DO NOT DISTRIBUTE 7 <br />