Laserfiche WebLink
G Personnel Training Costs <br /> The following items were taken into consideration: c 7 <br /> 40-hour Hazardous Waste Operations Training .f-4_�j <br /> H. Salvage Value from Sale of Treatment Equipment <br /> After decontamination, the following equipment will be non-hazardous and <br /> can be sold for salvage value: <br /> Seven tanks , n <br /> Clarifier <br /> Filter press <br /> Auxiliary equipment (mixer, motor, pH controller, etc.) <br /> Overall Closure Cost Estimate <br /> $1,391 <br /> The following standards and conversions were used to calculate your closure <br /> costs. <br /> ❖ 1 ton = 2000 pounds <br /> ❖ 1 gallon = 8.34 pounds <br /> ❖ For tho have een profiled, an(�veragef <br /> costo $450 per wastestrea as used as the profiling fee <br /> ❖ Transpo a ion and disposal rates for these wastestreams are an <br /> estimate onl estimates are-basedon informati 'ven to <br /> CDMS by azardous w e disposal firms. ;Actual costs will vary <br /> depending on a nature othe wastestream, type of shipping <br /> container and how the waste is handled once it reaches the TSDF. <br /> ❖ Figures have been rounded up to the next whole number. <br /> ❖ A 55-gallon drum of solid waste weighs 500 pounds. <br /> ( <br /> Delta Plating, Inc. 818 S. Stanislaus St. Page 1.10 <br /> Stockton, CA 95206 <br />