Costs for Decontamination of Containment Areas <br /> The following-items-were takeci--+nta-considerafie <br /> 1. Floors, bermed areas, trenches, piping, etc. will have to be <br /> decontaminated. The extent of the area(s) that need to be j <br /> decontaminated was determined. <br /> 2. Wash water generate containment areas is <br /> based on the size of the containment area. Most of the wash water from <br /> decontamination processes could be treated before the treatment units <br /> are disassembled. The final wash water generated from decontamination <br /> of containment areas must be drummed or pumped out and shipped for <br /> disposal. <br /> Transportation Costs <br /> Transportation costs have been included in Sections A, B and C. <br /> 41 <br /> Sampling Costs � � ��, Cer <br /> The following items were taken into consideration: " <br /> Sampling must be performed to prove that the waste treatment equipment <br /> and area is decontaminated. One wipe sample will be taken from each <br /> piece of treatment equipment and each containment area. Additionally, <br /> the estimate will includeone contingency sample for each sample in the ,. <br /> event that it is necessary. �v <br /> F. Closure Certification Costs <br /> The following items were taken into consideration: �� - <br /> Review of closure documentation by a Professional Engineer (PE) ,-�.✓ <br /> PE inspection <br /> PE certification <br /> f <br /> Delta Plating, Inc. 818 S. Stanislaus St. Page 1.9 <br /> Stockton, CA 95206 <br />