Laserfiche WebLink
- KLEINFELDER <br /> will be performed in accordance with the protocols detailed in the DISC Interim PEA <br /> Guidance Manual. <br /> 1.4. DTSC INSPECTION CONCERNS AND RECOMMENDATIONS <br /> Based on DTSCs Phase I Assessment Checklist Verification Inspection, DTSC <br /> recommended that the Plating Room and Treatment Area " be further investigated to <br /> define the horizontal and vertical extent of the release to the ground." References to <br /> leaks were in "plating bath in bermed area" and "wastewater treatment area which I <br /> observed stain and cracks in the floor." Specific areas within these two AOC however <br /> were not identified in the DTSC document. This PEA Workplan has been developed to <br /> address this recommendation. COPC to be evaluated per DTSC request in the two <br /> AOC are listed above in Section 1.2. <br /> 57252.T02/ST05R999/DH:ly Page 3 of 29 <br /> ©2005 Kleinfelder, Inc. September 1,2005 <br />