My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 5:33:55 PM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVI <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2-4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within five(5) <br /> working days pursuant to California Health&Safety Code, Section 25295. <br /> WATER L--10T PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000- 10,000 2 per Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES I Sample every 20 lineal feet <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT INT PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ <br /> #r groundwater interface <br /> SL"PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the stab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 R!r Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 10/19/98) Page 7 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.