My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Air Monitoring Requirements <br />Air monitoring type and frequencies performed during the individual tasks are described <br />below: <br />(1) <br />Tank and Pipe Emptying: <br />Direct reading using PID, (10.2 eV lamp span), within the exclusion zone boundaries and <br />in the breathing zones of workers for a minimum of 10 minutes every 15 minutes. <br />(2) <br />Tank and Pipe Emptying: <br />Direct reading using PID (10.2 eV lamp span), within the exclusion zone boundaries and <br />in the breathing zone of workers for a minimum of 10 minutes every 15 minutes. <br />(3) <br />Tank Purging: <br />Direct reading with combustible gas indicator (CGI) in combination with 02 within the <br />exclusion zone and at the tank's opening, continuously during the activity. <br />(4) <br />Soil Excavation and Excavation of Contaminated Material: <br />Direct reading with PID (10.2 eV lamp span) within the exclusion zone boundaries and in <br />the breathing zone of workers for a minimum of 10 minutes every 25 minutes. <br />(5) <br />Open Pit Soil and Water Sampling: <br />Direct reading with PID (10.2 eV lamp span) within the breathing zone of workers <br />continuously. <br />Site Closure Finishing: <br />(6) <br />and <br />Direct reading with PID (10.2 eV lamp span) within the boundaries of the exclusion zone <br />and in the breathing zone of workers for a minimum of 10 minutes every 30 minutes. <br />Air monitoring results and the professional judgment of the on-site health and safety <br />coordinator (OSHSC) will determine the actual level of personal protection during each <br />' <br />task performed under this CTO. The monitoring procedures are given on Page 12. <br />A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.