Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />• <br />Proposed Date of Investigation: December 1991 <br />Background Review is: Preliminary X <br />Complete <br />Overview Hazard is: <br />High Moderate X Low <br />Unknown <br />Justification for Overall Hazard Rating: Possible hazards on this job are expected to be <br />inhalation and contact with contaminated soils possibly contaminated with petroleum <br />hydrocarbons and gasoline. It is anticipated that Level C PPE is sufficient to protect workers <br />from over exposure. The actual level of personal protection will be determined during the course <br />of work based on air monitoring results and the professional judgment of the OSHSC. The action <br />levels applicable for work on this site are provided on page 16. <br />PRC Reviews <br />Plan Prepared by: Kseniia Mikulicic <br />Date: <br />Project Manager: Jeff Johnson <br />Date: <br />On -Site Health and <br />Safety Coordinator: Steve MacNeill <br />Date: <br />Health & Safety Coordinator, SF: Kseniia Mikulicic <br />Date: <br />CLEAN Health & Safety <br />Program Manager: Fred Stanley <br />Date: <br />A-8 <br />