My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPRODUCED AT GOVERNWNI EXPENSE <br />2.8 SPECIFICATIONS AND STANDARDS: The specifications and standard,,; <br />referenced in this project specification, including addenda, amendments, and <br />errata listed, will govern in all cases where references thereto are made. <br />In case of differences between these specifications or standards and this <br />project specification or its accompanying drawings, this project <br />specification and its accompanying drawings will govern to the extent of such <br />differences. Otherwise, the referenced specifications and standards will <br />apply only to materials and equipment that are furnished directly to the <br />Government and not to materials and equipment that are to be furnished and <br />installed by the Contractor. <br />2.9 OPTIONAL REQUIREMENTS: Where a choice of materials or methods, or both, <br />is permitted in this contract, the Contractor will be given the right to <br />exercise the option unless otherwise required by the specification. <br />2.10 GENERAL PROVISIONS: Any reference within this project specification to <br />a General Provision shall be understood to be a reference to the Contract <br />Clause(s) or the General Paragraph(s) addressing the subject matter of the <br />particular reference. <br />0 <br />***END OF SECTION*** <br />11MI, <br />
The URL can be used to link to this page
Your browser does not support the video tag.