My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RrPRODUCED AT GOVERNMENT EXPENSE - <br />2.1-3.1 Laboratory Inspection: Prior to approval the laboratory shall <br />submit in writing the following: <br />a. Functional description of the laboratories organizational <br />structure, operational department and support departments and <br />services. <br />b. A list and resume of the personnel assigned to the proposed <br />testing, including the person charged with engineering managerial <br />responsibility. <br />c. Affidavit of compliance with the applicable ASTM publication and <br />certification that the laboratory performs work in accordance with <br />technical requirements as required by the contract specifications. <br />d. A list of test and inspection equipment for each of the proposed <br />test procedures and certification that the equipment is calibrated <br />at prescribed intervals to insure the validity of the test and <br />inspection data. <br />e. A copy of the latest Laboratory Inspection Report by an independent <br />agency with laboratory certification that deficiencies (if any) have <br />been corrected. <br />2.1.4 Repeated Tests and Inspections: The Contractor shall repeat tests and <br />inspections after each correction 1- to nonconforming materials and <br />workmanship until tests and inspections indicate the materials, equipment and <br />workmanship conform to the contract requirements. The retesting and <br />reinspections shall be performed at no additional cost to the Government. <br />2.1.5 Daily Report to Inspector: The signed, "Daily Report to Inspector" <br />Form NAVFAC 4330/34 shall be submitted to the Contracting Officer by 10:00 AM <br />on the working day following the day the work was performed. <br />2.1.6 Monthly Report to Contracting Officer: A summary report shall also be <br />submitted at the end of each month. This shall contain the work done during <br />that month, test results, diagrams, etc. <br />***END OF SECTION*** <br />Rom <br />
The URL can be used to link to this page
Your browser does not support the video tag.