REPRWUCED AT GOVERNMENT EXPENSE, <br />construction procedure shall be altered, changed or modified to meet the <br />specified compaction requirements. <br />3.4.1 Compaction of Trench Refill: In rock, compact to 95 percent of ASTM D <br />1557, Method D, maximum density. In soft, weak, or wet soils, tamp refill to <br />consolidate and densify the material. In stable soils, compact to 95 percent <br />ASTM D 1557, Method D, maximum density. <br />3.4.2 Backfilling the Tank Cavity: Place backfill in layers not more than <br />8 -inches thick and within 2 percent of optimum content and compact to at <br />least 95 percent of maximum density (ASTM D 1557, Method D). <br />3.5 FINISHING AND SITE CLOSURE: The completed backfill shall conform to the <br />existing terrain. The finished surface shall be reasonably smooth, compacted, <br />and free from irregular surface changes. The degree shall be that ordinarily <br />obtainable from blade -grader operations, except as otherwise specified. The <br />site finishing work will be undertaken after the regulatory agency has <br />approved the tank removal and closure work. After completion of finishing <br />work, the general site will be cleaned of construction debris and a final <br />inspection will be performed. After successful inspection and receipt of <br />documentation of the tank and tank cavity inspection from the Government <br />Consultant, the tank removal project will be considered completed and final. <br />3.6 ASPHALT AND CONCRETE AREAS: Asphalt and concrete areas shall be <br />finished as follows: The excavations will be backfilled with remaining <br />excavated material, if clean, to within 16-18 inches of grade, topped by 12 <br />inches of class 2 aggregate compacted to 90-95 percent density, and finished <br />with 4-6 inches of asphalt paving or concrete (as shown in Sketch I'Ll'). <br />3.7 LAWNS AND LANDSCAPED AREAS: Where excavations cross lawn areas, sod <br />shall be replaced following backfilling. Carefully remove sod prior to <br />excavation. Store and maintain sod until earthwork is completed. Any <br />damaged sod shall be replaced at the Contractor expense (as shown in Sketch <br />"Ll'). <br />3.8 FIELD SAMPLING AND TESTING: In addition to provisions set forth <br />elsewhere in this contract, all sampling and testing shall be conducted by an <br />approved testing laboratory. Test backfill for conformance to gradation <br />limits in accordance with ASTM C 136, ASTM D 2419 and ASTM D 2487. Test <br />backfill materials for moisture density relations in accordance with ASTM D <br />1557, Method D. Perform at least one of each of the required test for each <br />material used. Provide additional tests as specified above for each source <br />change. Perform density tests in randomly selected locations and in <br />accordance with ASTM D 1556 or ASTM D 2922 and ASTM D 3017 as follows: one <br />test per 50 linear feet in each lift for trenches (minimum of one test per <br />lift) and one test in each layer of lift for the tank cavity. <br />***END OF SECTION*** <br />