Laserfiche WebLink
4.9 ACCIDENT PREVENTION PROGRAM <br />Geofon has instituted an Accident Prevention Program that meets the requirements of <br />USACE EM 385-1-1. <br />4.10 ADMINISTRATIVE RESPONSIBILITIES <br />The Project Manager will have primary responsibility for implementing safety <br />procedures. The Site Safety and Health Officer will have primary responsibility for enforcement <br />of safety provisions as outlined in the SSHP including daily Safety and Health inspections. Any <br />changes to the SSHP will require the review and approval of Geofon's CIH. The Geofon Quality <br />Control Inspector (QCI) is responsible for equipment safety (other than Safety and Health <br />equipment). <br />Geofon will comply with all local requirements including noise control and traffic <br />regulations. <br />Subcontractors are required to adhere to all policies and procedures in effect for the <br />delivery order, including the Site Safety and Health Program, the Site Safety and Health Plan, the <br />Accident Prevention Plan, all training requirements, etc. Subcontractor equipment and materials <br />will be required to submit to all required inspections and testing. <br />4.13 CONSTRUCTION FACILITIES <br />Geofon's construction facilities will be limited to a fenced construction laydown area. <br />Included in the laydown area will be material and equipment storage and all- subcontractor <br />23 <br />