Laserfiche WebLink
facilities, equipment and material. The laydown area will be adjacent to the contamination <br />reduction zone to allow for implementation of decontamination procedures. <br />4.14 TAILGATE MEETINGS <br />Daily site employee safety meetings will be held and documented onsite. Each day prior <br />to commencing work, a safety meeting shall be held to discuss safety considerations for the day <br />and work to be done. A safety topic will be addressed each day from the following list: <br />ZD <br />• Site Safety and Health Plan (first day, and once a week thereafter) <br />• Site Emergency Procedures <br />• Fire Fighting Techniques <br />• Decontamination <br />• Levels of Protection <br />• Emergency Equipment on Site <br />• Respirator Maintenance <br />• Back Care <br />A copy of the daily safety tailgate meeting form will be provided to the COR along with <br />the daily QC report. <br />4.15 TRAFFIC CONTROL <br />Geofon and its subcontractors will adhere to all base traffic regulations. It is not <br />anticipated that the need to control or detour traffic will be required during the course of this <br />project. <br />4.16 EMERGENCY RESPONSE <br />The Emergency Response Plan can be found in Section 4.8 — "Emergency Response and <br />Contingency Plan." <br />24 <br />