Laserfiche WebLink
11 <br />Ll <br />Table of Contents <br />1.0 INTRODUCTION.......................................................................................................................................1 <br />2.0 SITE DESCRIPTION AND HISTORY...........................................................................................•.......2 <br />3.0 <br />SUMMARY OF WORK........................................................................................:......................................3 <br />3.1 <br />PREPARATORY ACTIVITIES.............................................................................................................................3 <br />3.2 <br />ABOVEGROUND STORAGE TANK PLACEMENT.............................................................................................. 3 <br />3.3 <br />UNDERGROUND STORAGE TANK REMOVAL................................................................................................. 4 <br />4.0 <br />OBSERVATIONS DURING TANK REMOVAL..................................................................................6 <br />5.0 <br />METHODS AND PROCEDURES........................................................................................................... 7 <br />5.1 <br />DEMOLITION AND REMOVAL OF CONCRETE AND MISCELLANEOUS STRUCTURES ...................................... 7 <br />5.2 <br />LISTS EXCAVATION AND SOIL STOCKPILING................................................................................................ 7 <br />5.3 <br />LISTS INERTING.............................................................................................................................................. 7 <br />5.4 <br />UST REMOVAL............................................................................................................................................... 8 <br />5.5 <br />PIPING REMOVAL........................................................................................................................................... 8 <br />6.0 <br />SOIL SAMPLING PROCEDURES..........................................................................................................9 <br />7.0 ACTION LEVELS.....................................................................................................................................11 <br />8.0 LABORATORY ANALYTICAL RESULTS..........................................................................................12 <br />9.0 EXCAVATION BACKFILLING.............................................................................................................13 <br />10.0 CONCLUSIONS........................................................................................................................................14 <br />11.0 CERTIFICATION................................................................................................:.....................................15 <br />12.0 REFERENCES............................................................................................................................................16 <br />1 <br />TABLE 1: SUMMARY OF TANK REMOVAL <br />TABLE 2: SUMMARY OF SOIL SAMPLING <br />TABLE 3: RESULTS OF SOIL SAMPLE ANALYSES <br />FIGURES <br />FIGURE 1: VICINITY MAP <br />FIGURE 2: SITE PLAN AND SAMPLE LOCATION MAP <br />APPENDICES <br />APPENDIX A: PERMITS AND MANIFESTS <br />APPENDIX B: CERTIFIED ANALYTICAL REPORTS <br />APPENDIX C: PHOTOGRAPHIC RECORDS <br />APPENDIX D: DAILY FIELD REPORTS <br />APPENDIX E: SOIL COMPACTION TESTING REPORT <br />I <br />