My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Ll <br />Table of Contents <br />1.0 INTRODUCTION.......................................................................................................................................1 <br />2.0 SITE DESCRIPTION AND HISTORY...........................................................................................•.......2 <br />3.0 <br />SUMMARY OF WORK........................................................................................:......................................3 <br />3.1 <br />PREPARATORY ACTIVITIES.............................................................................................................................3 <br />3.2 <br />ABOVEGROUND STORAGE TANK PLACEMENT.............................................................................................. 3 <br />3.3 <br />UNDERGROUND STORAGE TANK REMOVAL................................................................................................. 4 <br />4.0 <br />OBSERVATIONS DURING TANK REMOVAL..................................................................................6 <br />5.0 <br />METHODS AND PROCEDURES........................................................................................................... 7 <br />5.1 <br />DEMOLITION AND REMOVAL OF CONCRETE AND MISCELLANEOUS STRUCTURES ...................................... 7 <br />5.2 <br />LISTS EXCAVATION AND SOIL STOCKPILING................................................................................................ 7 <br />5.3 <br />LISTS INERTING.............................................................................................................................................. 7 <br />5.4 <br />UST REMOVAL............................................................................................................................................... 8 <br />5.5 <br />PIPING REMOVAL........................................................................................................................................... 8 <br />6.0 <br />SOIL SAMPLING PROCEDURES..........................................................................................................9 <br />7.0 ACTION LEVELS.....................................................................................................................................11 <br />8.0 LABORATORY ANALYTICAL RESULTS..........................................................................................12 <br />9.0 EXCAVATION BACKFILLING.............................................................................................................13 <br />10.0 CONCLUSIONS........................................................................................................................................14 <br />11.0 CERTIFICATION................................................................................................:.....................................15 <br />12.0 REFERENCES............................................................................................................................................16 <br />1 <br />TABLE 1: SUMMARY OF TANK REMOVAL <br />TABLE 2: SUMMARY OF SOIL SAMPLING <br />TABLE 3: RESULTS OF SOIL SAMPLE ANALYSES <br />FIGURES <br />FIGURE 1: VICINITY MAP <br />FIGURE 2: SITE PLAN AND SAMPLE LOCATION MAP <br />APPENDICES <br />APPENDIX A: PERMITS AND MANIFESTS <br />APPENDIX B: CERTIFIED ANALYTICAL REPORTS <br />APPENDIX C: PHOTOGRAPHIC RECORDS <br />APPENDIX D: DAILY FIELD REPORTS <br />APPENDIX E: SOIL COMPACTION TESTING REPORT <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.