My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, <br />CONTRACTORS QUALITY CONTROL REPORT (OCR) SUBMIT DAILY To THEPA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />566 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 20 Nov 2001 <br />DD.iC-Sharpe Site. CA <br />CONTRACT NUMBER <br />DACWOS-00-D-0008 <br />coNTRAcroR (Or hired tabor) 1. WEATHER <br />l 1. <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />PAGE 1 <br />No Interruption. Na Precipitation <br />Temperature Min 55F Max 6SF <br />Soto Paving crew arrived at 0800. We all went to the security building to <br />obtain badges. A safety briefing was Conducted at 0920. The AC cutting <br />representative was also present. All of the equipment was inspected. Concrete <br />cutter began cutting AC at 0945. Soto representative left the site at 0930 to <br />get a load of Class II (virgin) asphalt base. The AC crew began prepping AC at <br />0930. AB prep was completed at 1230. It was decided that the AC would be <br />placed today. <br />The first load of AC arrived at 1415 hrs. AC placement began at 1425 hrs. The <br />final load of AC arrived at 1535 hrs. The Soto crew policed the area and <br />picked up all of the AC debris and loaded it onto their truck for off haul. <br />We left the site at 1700 hrs. <br />Subject: Safety Inspections/Meetings: <br />Workers were, told to obey all base safety rules. We discussed hazards <br />associated with placing AC including lifting. slipping. and tripping hazards. <br />Workers were reminded to wear proper work attire. They were also told to wear <br />proper hearing protection when needed. <br />7. CONTRACTORS ON SITE <br />The following Sub -Contractors started work today: <br />Soto Paving Company <br />The following Sub -Contractors have left the site: <br />Soto Paving Company <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Total hours on job site this day......... 10-0 <br />Total hours from start of construction 559-0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract pians and specifications, to the best of my knowledge, except as noted above. <br />QC REPRES TIVE's SIGNATOR DATE SUPERINTENDENT'S INITIALS DATE <br />Labor <br />Number Of <br />Hours <br />Sub -Contractor <br />Classification <br />Employees <br />Worked <br />GEOFON INC. <br />HEAVY -EQUIPMENT OPERATOR <br />0-0 <br />o_O <br />GEOFON INC. <br />LABORER, EXCAVATION (TERM) <br />0-0 <br />0.o <br />GEOFON INC. <br />SUPERV - EXCAVATING <br />1. a <br />10.0 <br />Total hours on job site this day......... 10-0 <br />Total hours from start of construction 559-0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract pians and specifications, to the best of my knowledge, except as noted above. <br />QC REPRES TIVE's SIGNATOR DATE SUPERINTENDENT'S INITIALS DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.