My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRAC <br />NALI <br />DY -1 I 11111A ILITCROJI 210101 <br />PROJECT <br />TO -0007 Remove 2 UST's, Install 1 AST <br />DDJC-Sharpe Site. CA <br />CONTRACTOR (Or hired labor) <br />Geofon Inc - <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />SUBMIT DAILY TO THE OA REPRESENTATIVE <br />REPORT NUMBER <br />560 PAGE 1 <br />DATE <br />14 Nov 2001 <br />CONTRACT NUMBER <br />DACW05-00-D-0008 <br />1. WEATHER <br />No Interruption. No Precipitation <br />Temperature Min 55F Max 70F <br />I arrived at the site at 0745 and waited for Alfanso Soto <paving contractor). <br />He was going to provide me with a cost estimate for placing the AC at Bldg. <br />330. Al Gonzales escorted us onto the site. V&W began drilling at 0820. <br />Alfanso was escorted off site at 0850. Garrett Weiss arrived at 0855 hrs. T-4 <br />sample was collected by Garrett Weiss at 0920 hrs. Dennis Catanyan arrived at <br />0925 hrs. Dennis wanted to know about the method employed during the <br />backfilling of the sample holes. I told him that V&W had mixed the cementuous <br />mix in a 55 gallon drum then poured it into the hole. Dennis was satisfied <br />with the explanation. Rebar was encountered at the T-5 sample location. Sample <br />location was moved 1' North. We then moved the sample location 1' West of the <br />original location (Dennis agreed) after hitting rebar again. Sample T-5 was <br />collected at 1250 hrs. Sample T-6 was collected at 1420 hrs. Garrett Weiss <br />hand delivered the samples to Fed Ex. Dennis and Al left the site. V&W <br />completed grouting and clean up of the site at 1530 hrs. We all left the site <br />at 1600 hrs. <br />Subject: Safety Inspections/Meetings: <br />A safety briefing and drill schedule was reviewed at 0800 hrs_ Topics of <br />discussion included proper work attire and work related hazards. Worker were <br />reminded to wear hard hats and safety vests. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Sub -Contractor <br />GEOFON INC. <br />GEOFON INC. <br />GEOFON INC. <br />Labor <br />Classification <br />HEAVY -EQUIPMENT OPERATOR <br />LABORER, EXCAVATION (TERM) <br />SUPERV - EXCAVATING <br />Number Of Hours <br />Employees Worked <br />o.00.0 <br />0.0 'O_0 <br />1.0 10.0 <br />Total hours on job site this day......... 10.0 <br />Total hours from start of construction 549.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRE // <br />TATIVE's SIG URE / DATE SUPERINTENDENT'S INITIALS DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.