My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUALITY ONTROL REPORT (QCR) SUBMIT DAILY TO T REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />405 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's_ Install 1 AST 12 Jun 2001 <br />DDJC -Sharpe Site_ CA CONTRACT NUMBER <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geos on Inc <br />PAGE 1 <br />C] <br />No Interruption. No Precipitation <br />SUPERVISOR <br />Temperature Min 65F Max 86F <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geo -Fon Inc crew arrived at 0600 hrs. Base material began arriving at 0725 hrs_ <br />Base material had enough moisture in it no additional waters were needed_ A <br />72" single drum roller was used to compact the material. A total of 252 tons <br />of material was placed. The work area was swept_ All out of the way obstacles <br />were moved. The roller was called off rent today_ Base material was placed to <br />a depth of 10" bgs_ <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Sub -Contractor <br />9. EQUIPMENT HOURS <br />Labor <br />Classification <br />HEAVY -EQUIPMENT OPERATOR <br />LABORER, EXCAVATION (TERM) <br />SUPERV - EXCAVATING <br />The following Equipment was used for the specified time: <br />Number Of <br />Employees <br />1.0 <br />1.0 <br />0.0 <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />10.0 <br />10.0 <br />Oqwr <br />20.0 <br />498-0 <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />000006 Yellow Loader 1 1-0 10-0 <br />000008 Yellow Smooth Drum Roller 1 1-0 10.0 <br />Total Hours 20-0 <br />11. EQUIPMENT CHECKS <br />The following Equipment was safety inspected today: <br />Type of Equipment Model # Serial # Results <br />Yellow Smooth Drum Roller Ramax Roller Passed <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESENTA 's SIGN R DATE SUPERINTENDS INITIALS DA E <br />
The URL can be used to link to this page
Your browser does not support the video tag.