Laserfiche WebLink
CONTRACTORS QUALITY C TROL REPORT (OCR) SUBMIT DAILY TO THOEPRESENTATIVE <br />DAILY LOCA OF CONSTRUCTION - MILITARY REPORT NUMBER <br />404 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's_ Install 1 AST 11 Jun 2001 <br />DDJC-Sharpe site- CA CONTRACT NUMBER <br />DACW05-00-0-0008 <br />9. EQUIPMENT HOURS <br />The following Equipment was used for the specified time: <br />ID Equipment Description <br />000006 Yellow Loader <br />000007 YELLOW JOHN DEERE EXCAVATOR <br />11. EQUIPMENT CHECKS <br />PAGE 3 <br />Hours On <br />Hours In <br />Shift Standby <br />Operation <br />1 1.0 <br />10.0 <br />1 1_0 <br />1.0 <br />Total Hours <br />11-0 <br />The following Equipment was safety inspected today: <br />Type of Equipment Model # Serial # <br />Yellow Back hoe John Deere 310E 226-05-0216 <br />Results <br />Passed <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC ,RE/�PRF /NTATJIVE's7N TURE DATE / SUPERINTENDENT'S TIALS DATE <br />