Laserfiche WebLink
CONTRACTORS QUALITY CONTROL REPORT (QCR) SUBMIT DAILY TO THE REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />400 PAGE 2 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 07 Jun 2001 <br />DDJC-Sharpe Site. CA CONTRACT NUMBER <br />DACW05-00-D-0008 <br />9. EQUIPMENT HOURS <br />The following Equipment was used for the specified time: <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />000006 Yellow Loader 1 0.0 10.0 <br />000007 YELLOW JOHN DEERE EXCAVATOR 1 0-0 10.0 <br />Total Hours 20.0 <br />11. EQUIPMENT CHECKS <br />The following Equipment was safety inspected today: <br />Type of Equipment Model # Serial # Results <br />YELLOW JOHN DEERE EXCAVATOR 690ECI EXCAVATO Passed <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC 7RE�ETIVE's SIGN TURE a DATE SUPERINTENDEN INITIALS D TE <br />