My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUALITY CONTROL REPORT (OCR) SUBMIT DAILY TO TM A REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />400 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST <br />DDJC-Sharpe Site. CA <br />CONTRACTOR (Or hired labor) <br />Geofon Inc_ <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />07 Jun 2001 <br />CONTRACT NUMBER <br />DACW05-00-D-0008 <br />1. WEATHER <br />No Interruption_ No Pr=ecipitation <br />Temperature Min 68F Max 94F <br />Subject: General Comments: <br />Geo -Fon crew arrived at 0600 hrs. Excavating operations were continued_ Once <br />again, there were no noticable stains around the UST and PID readings were less <br />than 5 ppm_ Two of the lids from the UST (South location) were removed. The <br />piping was removed. liquid from the pipe were collected in 5 gallon buckets and <br />then dumped into the UST_ No spillage. All of the piping was triple rinsed <br />into the UST_ The piping was stockpiled at the west end location on top of <br />visqueen. The outer fiberglass secondary containment piping was removed from <br />the piping_ All of the piping was cut into manageable sizes. All of the <br />manhole covers and rebar (removed from the concrete prior to off hauling) were <br />stockpiled at the north end away from the excavation_ <br />Subject: Safety: Inspections made, Deficiencies noted: <br />General safety was discussed. Workers were reminded of the heat stress related <br />issues_ Workers were also told to observes all safety regarding heavy <br />equipment traffic_ <br />4. PREP/INITIAL INSPECTIONS <br />Preparatory Inspection was held today for BACKFILL & SITE RESTORATION. <br />Preparatory Inspection was held today for SAMPLING. <br />Preparatory inspection was held today for UST REMOVAL. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />r] <br />C <br />11 <br />Labor Number Of <br />Hours <br />Sub -Contractor <br />Classification Employees <br />Worked <br />GEOFON INC. <br />HEAVY -EQUIPMENT OPERATOR 1-0 <br />10.0 <br />GEOFON INC. <br />LABORER, EXCAVATION (TERM) 2.0 <br />20.0 <br />GEOFON INC. <br />SUPERV - EXCAVATING 1-0 <br />10.0 <br />Total hours on job site this day.......... <br />40.0 <br />Total hours from start of construction <br />410.0 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.