My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUAL CONTROL REPORT (OCR) SUBMIT DAILY T A REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />359 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 27 Apr 2001 <br />ODJC-Sharpe Site_ CA CONTRACT NUMBER <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geo -fon Inc - <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />PAGE 1 <br />No Interruption, No Precipitation <br />Temperature Min 65F -Max 78F <br />Subject: General Comments: <br />Continued placing the product line. Geofon crew also placed a pipe stand in <br />the generator building and in front of the AST pad- I gave Don Valentine the <br />crane certifications_ He stated that the load certifications were acceptable. <br />I informed Don of a schedule change. We will not be excavating the 2-12.000 <br />gallon USTs until the last week of the month_ This is because of a prior <br />engagement. Don stated that he had no problem with this as long as the project <br />is completed within the contracted time. I also updated the report in/outs and <br />hard copy dailies up to 4/24/01. Don stated that he was very satisfied with <br />project progress so far. Dan Beever visited the site and also stated his <br />satisfaction. Dan also stated that hewould have all of the required <br />obsticles removes from the AST area. I noticed that all of the obsticles were <br />moved at approximately 1S30hrs. <br />Subject: Safety Inspections/Meetings: <br />Workers reviewed lifting and twisting safety tips. We also discussed nor- <br />weather <br />otweather issues relating to heat stress. Workers were reminded to drink plenty <br />of water and or liquids such as gatorade and other thirst quenching drinks. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1 - 0 8.0 <br />GEOFON INC. PIPE FITTER 1-0 8.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 24-0 <br />Total hours from start of construction 160-0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />fcontract plans and specifications, to the best of my knowledge, except as noted above. <br />DATE <br />QC REPR NTATIVE's SIGNQTUR DATE SUPERINTENDENT'S INITIALS <br />i <br />i, <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.