CONTRACTORS QUALITOONTROL REPORT (QCR) SUBMIT DAILY TO T REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />358 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 26 Apr 2002 <br />DOOC-Shape Site. CA CONTRACT NUMBER <br />r <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geo -Fon Inc. <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />PAGE 1 <br />No Interruption. No Precipitation <br />Temperature Min 6OF -Max 78F <br />Subject: General Comments: <br />Geo -Fon crew began installing the black pipe for the product feed and return. <br />Unistrut was placed into the channel. The piping will be placed on the <br />un! strut . A trench was hand dug around the pad. This trench was for the <br />lightning ground wire and rod. The ground rod was placed and cad welded onto <br />the ground rod. Weld was visually inspected and accepted. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1-0 8-0 <br />GEOFON INC. PIPE FITTER 2.0 8-0 <br />GEOFON INC. SUPERV - EXCAVATING 0.0 0.0 <br />Total hours on job site this day......... 16-0 <br />Total hours from start of construction 136-0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, 1 certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESiENTATIVE's SIt.NATURE DATE SUPERINTENDENT'S INITIALS DATE <br />Y112 <br />71,1 '?/0 <br />