My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUALITOONTROL REPORT (QCR) SUBMIT DAILY TO T REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />358 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 26 Apr 2002 <br />DOOC-Shape Site. CA CONTRACT NUMBER <br />r <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geo -Fon Inc. <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />PAGE 1 <br />No Interruption. No Precipitation <br />Temperature Min 6OF -Max 78F <br />Subject: General Comments: <br />Geo -Fon crew began installing the black pipe for the product feed and return. <br />Unistrut was placed into the channel. The piping will be placed on the <br />un! strut . A trench was hand dug around the pad. This trench was for the <br />lightning ground wire and rod. The ground rod was placed and cad welded onto <br />the ground rod. Weld was visually inspected and accepted. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1-0 8-0 <br />GEOFON INC. PIPE FITTER 2.0 8-0 <br />GEOFON INC. SUPERV - EXCAVATING 0.0 0.0 <br />Total hours on job site this day......... 16-0 <br />Total hours from start of construction 136-0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, 1 certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESiENTATIVE's SIt.NATURE DATE SUPERINTENDENT'S INITIALS DATE <br />Y112 <br />71,1 '?/0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.