My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUAL CONTROL REPORT (OCR) SUBMIT DAILY E OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY r REPORT NUMBER <br />357 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's_ Install 1 AST 25 Apr 2001 <br />DDJC-Sharpe Site_ CA CONTRACT NUMBER <br />DACWOS-00-0-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geofon Inc_ <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />PAGE 1 <br />No Interruption. No Precipitation <br />Temperature Min SSF- Max 75F <br />Subject: General Comments: <br />Jose Jiminez and Mike Regli will be the only two on site for the next Couple of <br />days_ Part of the day was spent chasing parts. On site work began at <br />approximately 0930_ Geo -Fon crew began pipe fitting procedures for installation <br />of the AST pipe. Trenching was dug to 18" below ground surface. Piping <br />pruchased and placed was rigid galvinized pipe that was coated with PVC_ <br />Entrance points for the pipe into the building were bored yesterday. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of <br />Sub -Contractor Classification Employees <br />GEOFON INC. LABORER, EXCAVATION (TERM) 16-0 <br />GEOFON INC. SUPERV - EXCAVATING 0.0 <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />�, QC REPRESYNTATIVE's SIPAIA URE DATE SUPERINTENDENT'S INITIALS DATE <br />16.0 <br />O_o <br />16. <br />40 <br />120.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.