My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. PLANNED ATTENDANTS: <br />NAME <br />Dave Lanthier <br />Don Valentine <br />Robert Castaneda <br />B. SUBMITTALS: <br />ITEM <br />C. QC REQUIREMENTS: <br />ITEM <br />D. EQUIPMENT: <br />ITEM <br />-0 0007 Remove 2 UST's, Install ST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />r r r � r � �'r r: • �, <br />POSITION <br />Concrete Finisher <br />COE Representative <br />Field Operations Manager <br />DESCRIPTION <br />1*01 112H410 <br />E. CERTIFICATION THAT ALL PRELIMINARY WORK HAS BEEN COMPLETED: <br />Date: 04/23/2001 <br />COMPANY <br />Nature Crete <br />USACE <br />USACE <br />QA CODE <br />STATUS <br />INSPECTED <br />Concrete formwork has been inspected by the site representative (COE). All <br />preliminary work has been completed. The forming materials are as required in the <br />specifications. The concrete.facility has been contacted and the mix design has <br />been given to the COE representative. <br />-------------------------------------------------------------------------------------------------------------------------- <br />F. METHODS AND PROCEDURES FOR PERFORMING QUALITY CONTROL: <br />Two test cylinders will be collected and break tests will be performed to decide <br />the best time for AST placement. <br />Visual inspection will be part of the quality control inspection for this activity. <br />(1)(6)(4) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.