Laserfiche WebLink
A. PLANNED ATTENDANTS: <br />NAME <br />Dave Lanthier <br />Don Valentine <br />Robert Castaneda <br />B. SUBMITTALS: <br />ITEM <br />C. QC REQUIREMENTS: <br />ITEM <br />D. EQUIPMENT: <br />ITEM <br />-0 0007 Remove 2 UST's, Install ST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />r r r � r � �'r r: • �, <br />POSITION <br />Concrete Finisher <br />COE Representative <br />Field Operations Manager <br />DESCRIPTION <br />1*01 112H410 <br />E. CERTIFICATION THAT ALL PRELIMINARY WORK HAS BEEN COMPLETED: <br />Date: 04/23/2001 <br />COMPANY <br />Nature Crete <br />USACE <br />USACE <br />QA CODE <br />STATUS <br />INSPECTED <br />Concrete formwork has been inspected by the site representative (COE). All <br />preliminary work has been completed. The forming materials are as required in the <br />specifications. The concrete.facility has been contacted and the mix design has <br />been given to the COE representative. <br />-------------------------------------------------------------------------------------------------------------------------- <br />F. METHODS AND PROCEDURES FOR PERFORMING QUALITY CONTROL: <br />Two test cylinders will be collected and break tests will be performed to decide <br />the best time for AST placement. <br />Visual inspection will be part of the quality control inspection for this activity. <br />(1)(6)(4) PAGE 1 <br />