Laserfiche WebLink
0007 Remove 2 UST's, Install ST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />AST RELOCATION <br />,*REPARATORY INSPECTIONO., ! <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Jose Jiminez <br />Robert Castaneda <br />POSITION <br />Date: 04/28/2001 <br />COMPANY <br />COE Field Representative USACE - <br />Pipe Fitter Geofon Inc. <br />Field Operations Manager Geofon Inc. <br />-------------------------------------------------------------------------------------------------------------------------- <br />8. ITEMS OF MUTUAL UNDERSTANDING: <br />.Crane inspection will be done prior to lifting AST <br />.Low bed will be used to transport AST to new location <br />.Pressure test will be done prior and after relocation of AST <br />.All of the objects that are in the way of the AST will be moved by the base prior <br />to relocating of the AST. <br />.Break test results will be given to COE rep. prior to making -the move: <br />-------------------------------------------------------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />QC REPR ,EN TI ATU E DATE <br />(1)(6)(4) PAGE 1 OF 1 <br />