My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0-0007 Remove 2 UST's, Install 10 <br />ST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Jose Jiminez <br />Robert Castaneda <br />B. ITEMS OF MUTUAL UNDERSTANDING: <br />POSITION <br />Date: 04/24/2001 <br />COMPANY <br />COR Field Representative USACE - <br />Pipe Fitter Geofon Inc. <br />Field Operations Manager Geofon Inc. <br />.Piping will begin from the generators to the AST. <br />.Final connections to the AST will occur after placement of the AST to the pad. <br />Piping will be placed on unistruts to be placed in the channel. A pressure test <br />will be done on the AST prior to moving the AST. <br />.A pressure test will be done on the AST after moving the AST. <br />.All preparations will be made to the AST prior to moving it. <br />.Crane will have all certifications reviewed prior to lifting the AST <br />.AST will be transported on a lowbed truck. <br />.Break test results will be given to the COR rep. prior to placing the AST on the <br />pad. <br />.All connections will be visually inspected and approved prior to final connection <br />to generators and AST. <br />-------------------------------------------------------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />QC REPRESENTATI'C/E�SIGNATURE <br />(1)(6)(4) — PAGE 1 OF 1 <br />DATE <br />4/i <br />
The URL can be used to link to this page
Your browser does not support the video tag.