Laserfiche WebLink
0-0007 Remove 2 UST's, Install 10 <br />ST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Jose Jiminez <br />Robert Castaneda <br />B. ITEMS OF MUTUAL UNDERSTANDING: <br />POSITION <br />Date: 04/24/2001 <br />COMPANY <br />COR Field Representative USACE - <br />Pipe Fitter Geofon Inc. <br />Field Operations Manager Geofon Inc. <br />.Piping will begin from the generators to the AST. <br />.Final connections to the AST will occur after placement of the AST to the pad. <br />Piping will be placed on unistruts to be placed in the channel. A pressure test <br />will be done on the AST prior to moving the AST. <br />.A pressure test will be done on the AST after moving the AST. <br />.All preparations will be made to the AST prior to moving it. <br />.Crane will have all certifications reviewed prior to lifting the AST <br />.AST will be transported on a lowbed truck. <br />.Break test results will be given to the COR rep. prior to placing the AST on the <br />pad. <br />.All connections will be visually inspected and approved prior to final connection <br />to generators and AST. <br />-------------------------------------------------------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />QC REPRESENTATI'C/E�SIGNATURE <br />(1)(6)(4) — PAGE 1 OF 1 <br />DATE <br />4/i <br />