My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CONTRACTORS QUALITY CONTROL REPORT (QCR) <br />SUBMIT DAILY TO THE OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY <br />WEPORT NUMBER <br />350 PAGE 1 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 USTrs, install 1 AST <br />18 Apr 2001 <br />DDJC-Sharpe Site, CA <br />CONTRACT NUMBER <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) <br />1. WEATHER <br />Geofon Inc. <br />_ <br />SUPERVISOR <br />No Weather Reported <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geofon crew arrived on site at 0745. Continued grading the pad area. A <br />vibra-plate was rented from Hertz and used to compact the soil. Bob with <br />Nunes Heavy equipment Services arrived on site at 0830. Dan Beevers was also <br />on site. A general discussion on where the AST will be placed took place. Bob <br />will be bringing a 50 ton crane to lift the AST and place it on the low bed. <br />Bob needed to view the site prior to making crane arrangements. Bob, Dan and I <br />went to the AST location to see what needs to be moved to make the lift a safe <br />one. There were some items near the AST that need to be moved. Dan stated <br />that he would look into making sure that the necessary items are moved and he <br />also stated that he would look into making sure that the liquids are removed <br />from the AST. Once the work area was compacted and demarcated the Geofon crew <br />'left the site. Concrete forming and placement will commence tomorrow morning. <br />Subject: Safety Inspections/Meetings: <br />Traffic control measures and demarca-tion of work areas were discussed. Slips, <br />trips and falls were also reviewed. <br />4. PREP/INITIAL INSPECTIONS <br />Initial Inspection was held today for PLACEMENT OF CONCRETE PAD. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 2.0 8. 0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 16.0 <br />Total hours from start of construction 56.0 <br />9. EQUIPMENT HOURS <br />The following Equipment was used for the specified time: <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />000003 Wacker vibratory compactor 1 0.0 4.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.