Laserfiche WebLink
CONTRACTORS QUALITY CONTROL REPORT (QCR) SUBMIT OAN Y TO THE OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION -MILITARY =RIER <br />- f== <br />PROJECT PAGE <br />DATE <br />TO-0007 Remove 2 UST's, Install 1 AST 17 Apr 2001 <br />DDJC-Sharpe Site, CA CONTRACT NUMBER <br />DACWOS-00-D-0008 <br />S. EQUIPMENT HOURS <br />The following Equipment was used for the specified time: <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />000002 Walk behind self propelled concrete saw. 1 0.0 4,0 <br />00001 Yellow Extendahoe. 4 in one bucket 1 0.0 4.0 <br />Total Hours 8.0 <br />11. EQUIPMENT CHECKS <br />The following Equipment was safety inspected today: <br />Type of Equipment Model ## Serial ## Results <br />Yellow Extendahoe. 4 in one Case 580L JJG0241146 Passed <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />OC REPijE� TE's SIGNAE DATE SUPERINTENDENT'S INITIALS DATE <br />