Laserfiche WebLink
TO -0007 Remove 2 U4T's, Install 1 AST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />FORMWORK FOR AST PAD <br />PREPARATORY INSPECTION OUTLINE <br />A. PLANNED ATTENDANTS: <br />NAME POSITION <br />Don Valentine COR Representative USACE <br />Jose Jimninez Laborer Geofon <br />Mike Regli Laborer Geofon <br />Robert Castaneda Site Supervisor Geofon <br />Date: 04/19/2001 <br />- COMPANY <br />----------------------------------------------------------------------------------------------------------------- <br />B. SUBMITTALS: <br />ITEM DESCRIPTION QA CODE <br />--------------------------------------------------------------------------------------------------------------- <br />C. QC REQUIREMENTS: <br />ITEM DESCRIPTION STATUS <br />-------------- <br />D. EQUIPMENT: <br />ITEM DESCRIPTION INSPECTED <br />000002 Walk behind self propelled concrete saw. 07/17/2001 <br />000003 Wacker vibratory compactor 04/18/2001 <br />00001 Yellow Extendahoe. 4 in one bucket 04/17/2601 <br />--------------------------------------------------------------------------------------- ------ ------ <br />E. CERTIFICATION THAT ALL PRELIMINARY WORK HAS BEEN COMPLETED: <br />All preliminary work has been completed as discussed. Formwork has been erected in <br />the design discussed at the preparatory. The rebar patter exceeds original <br />requirements. Base has been compacted. All preparations complete. <br />-------------------------------------------------------------------------------------------------------------------------- <br />(1)(6)(4) PAGE 1 <br />