Laserfiche WebLink
TO -0007 Remove 2 UST's, Install 1 AST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />FORMWORK FOR AST PAD <br />PREPARATORY INSPECTION MEMORANDUM <br />A. PERSONS IN ATTENDANTS: <br />NAME POSITION <br />Don Valentine COR Representative USAGE <br />Robert Castaneda Site Supervisor _ Geofon <br />Date: 04/19/2001 <br />- COMPANY <br />---------------------------------------------------------------------------------- <br />B. ITEMS OF MUTUAL UNDERSTANDING: <br />Forms shall be placed in such a manner that the pad will be a monolithic pour. The <br />channel shall be formed in such a manner that it will match the surrounding <br />landscape. <br />Form work shall be inspect prior to concrete placement. <br />Rebar will be used to reinforce concrete pad. <br />Forms shall be placed on a suitable surface. <br />----------------------------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />OC REPRESENTATI E SIGNAT RE DATE <br />�i <br />(1)(6)(4) PAGE 1 OF 1 <br />