Laserfiche WebLink
TO -0007 Remove 2 UST's, Install 1 AST <br />DDJC-Sharpe Site, CA <br />DACWOS-00-D-0008 <br />FORMWORK FOR AST PAD <br />INITIAL PHASE CHECK LIST <br />NAME POSITION <br />Don Valentine COE Base Representative <br />Robert Castaneda Field Operations Manager <br />Date: 04/19/2001 <br />- COMPANY <br />USACE <br />Geofon Inc. <br />----------------------------------------------------------------------------------------- <br />B. MATERIALS VERIFY: <br />Lumber used was new lumber. Rebar used was also recently purchased. <br />------------------------------------------------------------------------------------------- <br />C. METHODS OR PROCEDURES OBSERVED: <br />Formwork has been placed in a very professional manner. All forms have been kicked <br />off properly. All seems to be in place for concrete placement tomorrow. <br />---------------------------------------------------------------------------------------------------- <br />D. WORKMANSHIP OBSERVED: <br />Workmanship can be classified as professional. All aspects of form placement <br />approved by QC representative. 4 <br />--------------------------------------------------------------------------------------------- <br />E. SAFETY OBSERVED: <br />All safety rules observed. An electrical cord was replaced because of defect. <br />This was noticed by Don Valentine on a site visit. <br />-------------------------------------------------------------------------------------------------- <br />QC REPR ENTATIVE SIGNATU E <br />DATE/ <br />(1)(6)(4) PAGE 1 OF 1 <br />