Laserfiche WebLink
*0-0007 Remove 2 UST's, Install 1 AST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />PLACEMENT OF CONCRETE PAD <br />PREPARATORY INSPECTION MEMORANDUM <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Jose Jiminez <br />Mike Regli <br />Robert Castaneda <br />POSITION <br />COE Base Representative <br />Site Foreman <br />Laborer <br />Field Operations Manager <br />Date: 04/20/2001 <br />- COMPANY <br />USAGE <br />Geofon Inc <br />Geofon Inc. <br />Geofon Inc <br />----------------------------------------------------------------------- <br />E. ITEMS OF MUTUAL UNDERSTANDING: <br />All damaged areas will be put back to original condition. <br />Concrete pad will meet all Convault specs. Concrete mix design will meet 3,500 psi <br />requirements. 2 concrete cylinders will be filled to get 5 and 7 day break tests. <br />COR will be given results of break test prior to placing AST. <br />---------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />OC REPRESENTA AVE SIGN RE' DATE <br />(1)(6)(4) PAGE 1 OF 1 <br />