My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*0-0007 Remove 2 UST's, Install 1 AST <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />PLACEMENT OF CONCRETE PAD <br />PREPARATORY INSPECTION MEMORANDUM <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Jose Jiminez <br />Mike Regli <br />Robert Castaneda <br />POSITION <br />COE Base Representative <br />Site Foreman <br />Laborer <br />Field Operations Manager <br />Date: 04/20/2001 <br />- COMPANY <br />USAGE <br />Geofon Inc <br />Geofon Inc. <br />Geofon Inc <br />----------------------------------------------------------------------- <br />E. ITEMS OF MUTUAL UNDERSTANDING: <br />All damaged areas will be put back to original condition. <br />Concrete pad will meet all Convault specs. Concrete mix design will meet 3,500 psi <br />requirements. 2 concrete cylinders will be filled to get 5 and 7 day break tests. <br />COR will be given results of break test prior to placing AST. <br />---------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />OC REPRESENTA AVE SIGN RE' DATE <br />(1)(6)(4) PAGE 1 OF 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.