CONTRACTORS QUALITY CONTROL REPORT (QCR) <br />SUBMIT DAILY TO THE OA REPRESENTATIVE <br />REPORT NUMBER <br />DAILY LOG OF CONSTRU N - MILITARY <br />355 PAGE 1 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />23 Apr 2001 <br />CONTRACT NUMBER <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) <br />1. WEATHER <br />Geofon Inc. <br />No Interruption, No Precipitation <br />SUPERVISOR <br />Temperature Min SOF Max 73F <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />I arrived at the Sharpe Site at 0800. Nature Crete crew arrived at 0900. I <br />went to Hertz to rent an auger and a concrete saw. It was decided that we <br />would cut additional AC necessary to place the bollards around the concrete <br />pad. Final preparations for concrete placement were made.and Bollard posts <br />were purchased. <br />Don Valentine arrived on site at approximately 1030 hrs. Another visual <br />inspection of the forms was made. Everything looked ready. A brief discussion <br />was conducted between myself and Don about the AST placement. I informed Don <br />of all preparatory issues for the AST placement. <br />The concrete arrived at 1200. Two cylinders were prepared for 4 -day and 7 -day <br />break tests. The concrete truck left at approximately 1220 hrs. We were <br />approximately 1 cy short. A second concrete truck arrived at approximately <br />1345 and concrete placement was completed. The bollard placement was also <br />completed. <br />Final touches were made on the pad and channel. Don witnessed the concrete <br />placement. It was decided not to make any kind of construction joints in the <br />pad because this would defeat the definition of a containment pad. <br />The concrete test cylinders were left in place and will be taken to Kleinfelder <br />tomorrow. Work area was secured prior to leaving the site. <br />Subject: Safety Inspections/Meetings: <br />All of the safety issues discussed on Friday were reviewed today. Issues tied <br />in to working with and around concrete. <br />4. PREP/INITIAL INSPECTIONS <br />Preparatory Inspection was held today for AST RETROFITTING. <br />Initial Inspection was held today for PLACEMENT OF CONCRETE PAD. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 0.0 0.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 8.0 <br />Total hours from start of construction 80.0 <br />