My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I N C O R P O R A T E D <br />65 QUINTA COURT, SUITE D, SACRAMENTO, CA 95823 <br />16 January 2002 TELEPHONE: (916) 681-3601 • FAX (916) 681-3628 <br />INTERNET. www.geofon.com <br />Mr. Larry Smith <br />Administrative Contracting Officer <br />Sacramento Resident Office <br />Corps of Engineers <br />2194 Ascot Avenue <br />Rio Linda, California 95673-9988 <br />Subject: Final Underground Storage Tanks Closure Report, Building 330 <br />Lathrop, California <br />Contract No. DACW05-00-D-0008, Delivery Order # 0007 <br />Geofon Project No. 05-5546 <br />Dear Mr. Smith: <br />Geofon, Inc. (Geofon) is pleased to submit 8 (eight) copies of the Final Underground Storage <br />Tanks Closure Report inserts for Building 330 at the Sharpe Site in Lathrop, California. The <br />purpose of these inserts is to finalize documented activities related to removal of the <br />underground storage tanks at the subject site. The scope of work consisted of placement of one <br />aboveground storage tank, excavation and removal of two underground storage tanks with <br />associated piping and appurtenances, soil sampling, and backfilling of the excavation and <br />trenches at the subject site. <br />The enclosed inserts include corrections from comments scription of the procedures employed <br />by Geofon during the execution of this scope of work. <br />Geofon appreciates the opportunity to provide assistance on this site and we look forward to <br />working with USACE on future projects. If you have any questions regarding this report, please <br />do not hesitate to call the undersigned at (916) 681-3601. <br />Sincerely, <br />Geofon Inc. <br />Robert Castaneda <br />Project Manager <br />��asawwar "TK" Khanv <br />Program Manager <br />cc: Mr. Dennis Catanyag (1 copy) <br />Project file (i copy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.