My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 1:52:51 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE I <br />TYPE OF ACTION ® L NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />Min <br />N TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02 <br />eek one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) _ <br />BUSINESS NAME (Same as FACILITY NAME) California Fuel Supply 136144 <br />Moa <br />BUSINESS SITE ADDRESS 2575 Country Club M04. <br />CITY Stockton <br />Mos <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED ® I. ANNUALLY M06 ❑ 99, OTHER (Specify): M07. <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, line leak <br />detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification form, Hazardous <br />Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />MID <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY E b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />Mil. <br />PANEL MANUFACTURER: Veeder Root M12. MODEL #: TLS-35OR <br />M13. <br />LEAK SENSOR MANUFACTURER: Veeder Root M14MODEL #(S): 794380-420 <br />M15 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: MI6. MODEL III!: <br />MIT <br />IN -TANK PROBE MANUFACTURER: MIR' MODEL#(S): <br />Mlq <br />LEAK TEST FREQUENCY: ® a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20, <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />M21. <br />g. p. g.p.h. (P fY)� <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ® b. 0.2 h. ❑ c. OTHER (Specify): <br />M22 M23 <br />Vis. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR $2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />M26 M27 <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requiresagencyapprovau <br />❑ 99. OTHER (Specify): <br />Mex <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mao. <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />Mai, <br />PANEL MANUFACTURER: Veeder Root M32. MODEL #: TLS -350R <br />M33. <br />LEAK SENSOR MANUFACTURER. Veeder Root M34' MODEL #(S): 794380-208 <br />M3.5 <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ® a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M37. <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW <br />WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s): M311. MODEL #(S): <br />M34 <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: Red Jacket M40 MODEL #: FXV <br />M41 <br />PROGRAMMED IN LINE TESTING: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42 <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M43 <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />Moa. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />M45. M46. <br />'ISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY* ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED** <br />M47 <br />_ * Requires .gooey approval ^ Allowed for monitoring of unbutiud emergency generator fuel piping only per HSC §252111.5(b)(3) <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />1-199. OTHER (Specify) <br />Max <br />'-'r..'__. roi1,unAN 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.