Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE Z <br />VI. DISPENSER MONITORING <br />IONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: Veeder Root M51. MODEL #: TLS -350R M52. <br />LEAK SENSOR MANUFACTURER: Bravo M53. MODEL #(S): B -8000 -BD -AB M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a. YES ❑ b. NO M55. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO M56 <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES M h Nn M57. <br />❑ 2, MECHANICAL CONTINUOUS MONITORING (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE M CASE OF LEAK <br />MANUFACTURER: MSR. MODEL # S <br />( ). <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) <br />M59, <br />M60 <br />M61. <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST PERFORM ENHANCED LEAK M70 <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN, PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />l . ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) MRo. <br />2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of January 1, 2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND STATISTICAL <br />INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99, ❑ OTHER (Specify): MRI. <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job -duties and can access those documents when needed. <br />January 1, 2005, this facility will have a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code <br />icil (ICC). By July I, 2005, and annually the the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST <br />_a r wm u�oiuuc, Uui 15 not nmueu to, me ionowmg: <br />Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency): Mas <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED M SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN TITLE 23 CCR § 2715(c), AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE <br />FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(c). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the informs 'on provided herein is true and accurate to the best of my knowledge. <br />OWNER/OPERA OR SIGNATURE REPRESENTING DATE: M91. <br />® Owner M90 <br />❑ Operator December 14, 2006 <br />OWNER/OPERATOR NAME (print): M92. <br />OWNER/OPERATOR TITLE: M93 <br />Mike Ahmadi <br />L dgC� <br />(AReMy Use On/v) This plan has been reviewed and. ❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />kgency Signature: <br />Comments/Special Conditions: <br />