Laserfiche WebLink
Page 1 of 2 <br /> Garrett Backus [EH] <br /> From: m.vendeiro@att.net <br /> Sent: Tuesday, February 16, 2010 2:13 PM <br /> To: Garrett Backus [EH] <br /> Cc: David Hinds <br /> Subject: Re: 2575 Country Club-Country Club 76 <br /> Garrett, <br /> Please accept the following as response to your information requests: <br /> 1. Smith penetration part number- 012030-626-0 to be used at each of our piping entries <br /> 2. Smith adhesive part number- Primary 7014, Secondary 7069 with Smith filler <br /> 3. The Bravo piping sump and vent transition sump will be tested at 4psi for a minimum of one hour <br /> after the penetration fitting(s)have been installed per the Bravo installation instructions, Section E. <br /> 4. Bravo interstitial fluid, part number IMF-1GAL will be used to fill the sumps interstitials <br /> 5.The Bravo interstitial fluid will be introduced into the interstials using the Bravo filling instructions, <br /> Section F. <br /> The product line will be tested at 50 psi for a minimum of one hour. The vent piping and all secondary <br /> lines cut for this work will be tested at 5 psi for a minimum of one hour. <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br /> mvpeng@att.net <br /> 916-205-1537 <br /> -------------- Original message from "Garrett Backus [EH]" <gbackus@sjcehd.com>: -------------- <br /> Hi Mark, <br /> I received the permit application revision and need the following information before I can approve the <br /> application: <br /> 1)Smith penetration fittings part numbers <br /> 2)Smith adhesive part number <br /> 3)Are you doing the air pressure test(4 psi -one hour)on the sumps before filling with interstitial fluid? <br /> The Bravo 8400 sump instructions list this test as being mandatory. <br /> 4)What interstitial fluid will be used? <br /> 5) How are you filling the interstitial space with fluid? Are you using the vacuum method outlined in the <br /> Bravo instructions? <br /> We will require primary line tests on all lines being cut-91 product line, all vent lines. <br /> We will require secondary containment tests on all parts of the UST system affected by the excavation: <br /> 91 product line, all vent lines, 91 STP sump, vent sump, 91 tank and any other exposed piping or other <br /> components. <br /> 2/16/2010 <br />