My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 1:52:51 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Garrett Backus [EH] <br /> From: m.vendeiro@att.net <br /> Sent: Tuesday, February 16, 2010 2:13 PM <br /> To: Garrett Backus [EH] <br /> Cc: David Hinds <br /> Subject: Re: 2575 Country Club-Country Club 76 <br /> Garrett, <br /> Please accept the following as response to your information requests: <br /> 1. Smith penetration part number- 012030-626-0 to be used at each of our piping entries <br /> 2. Smith adhesive part number- Primary 7014, Secondary 7069 with Smith filler <br /> 3. The Bravo piping sump and vent transition sump will be tested at 4psi for a minimum of one hour <br /> after the penetration fitting(s)have been installed per the Bravo installation instructions, Section E. <br /> 4. Bravo interstitial fluid, part number IMF-1GAL will be used to fill the sumps interstitials <br /> 5.The Bravo interstitial fluid will be introduced into the interstials using the Bravo filling instructions, <br /> Section F. <br /> The product line will be tested at 50 psi for a minimum of one hour. The vent piping and all secondary <br /> lines cut for this work will be tested at 5 psi for a minimum of one hour. <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br /> mvpeng@att.net <br /> 916-205-1537 <br /> -------------- Original message from "Garrett Backus [EH]" <gbackus@sjcehd.com>: -------------- <br /> Hi Mark, <br /> I received the permit application revision and need the following information before I can approve the <br /> application: <br /> 1)Smith penetration fittings part numbers <br /> 2)Smith adhesive part number <br /> 3)Are you doing the air pressure test(4 psi -one hour)on the sumps before filling with interstitial fluid? <br /> The Bravo 8400 sump instructions list this test as being mandatory. <br /> 4)What interstitial fluid will be used? <br /> 5) How are you filling the interstitial space with fluid? Are you using the vacuum method outlined in the <br /> Bravo instructions? <br /> We will require primary line tests on all lines being cut-91 product line, all vent lines. <br /> We will require secondary containment tests on all parts of the UST system affected by the excavation: <br /> 91 product line, all vent lines, 91 STP sump, vent sump, 91 tank and any other exposed piping or other <br /> components. <br /> 2/16/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.