Laserfiche WebLink
Apr 20 04 08: 43a LMH Facilities Management (209) 339-7672 p. 6 <br /> SWRCB,January 2002 rdgp'T, or 3 <br /> 9, SFY_L.[./OVFRFIL.L CONTAINMENT BOXIWS <br /> Facility is Mot B ui ed With 5L.q/Ovcrfill Containment Buxcs U <br /> Spill/overfill Containment RVXCS arc present,but were blot"rested U <br /> Test Method Developed By, ®Spill Bucket Manufacturer tKdustry Standard 0 Professional Enbinccr <br /> o Other 0pccifj) <br /> Tcst Mcthod Used: 0 Pressure ❑Vacuum tic <br /> l:l Uthcr(Specify) <br /> s. <br /> Tcst Equipment Used: ,})w f-- - e Equipment Resulueion: <br /> i r - pra,estmehetwYma l6oMw 9' 'tdungt tin�sa NSRvMi ihe� ,;AN i+'khs{y�Aawlmh°.4e�YA+n�}..ger., -ko 00.Agwwe+,' �ekcr, S,cam'kk•oi+�:. <br /> Spilt Box# Spill Box# Spill Box if Spilt Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressurelvacuum/water and <br /> starting test: _ -8 <br /> Test Start Time: " <br /> r <br /> Initial Rcading(Rs): Ober <br /> Test End Time: /'f s/ "— <br /> Final heading(RP): ff7 5- rf <br /> Test Duration: <br /> Chance in Rcading(Rt R,): <br /> Pass/Fait Threshold or <br /> Criteria. <br /> Tcst Result. Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail C Pass 0 Fail <br /> Commcnis— include rrD oratarion on re airs made aringr to tcsringg, and recommended allow-spun for failed texts) y. <br /> Srs�r+re sJ Pel / a-7 4 � LI sO L,e 1 ® nP <br /> s <br /> e <br /> PO T On Mn n7 .jd14 <br />