Laserfiche WebLink
Apr 20 04 08: 43a LMH Facilities Management (2 <br /> 161339-7672 p. 7 <br /> SWP,.CB,January 2002 Pagc 3 <br /> S. SECONDARY PIPE TESTING <br /> fest Method Developed By. n Piping Manufactures LLkrgu-stry Standard 0 Professional Eji&ccr <br /> n Other(Specify) <br /> Test Method Used, a,ressuro C)Vacuum 17, <br /> CI Other(Specify) <br /> 'rest Equipment Uscd: Alllr&4�eg YL 2 g Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Run# <br /> Piping Material, <br /> W <br /> Piping Manufacturer. n) <br /> Piping Diameter <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> _piping-run isolation., e rfl f-j2&Lf i V"eSM'I-C J-204- <br /> Wait time between applying <br /> prcssure/vacuum/watcr and <br /> iaE! �tact: <br /> Test Start Time: 0 40 <br /> Initial Reading(RI): -F-4j c I <br /> Test End Time: 4-0 <br /> Final Reading(Rr,)., <br /> Test Duration: <br /> 1 Change in Rcading(RrR,): -Le�-- <br /> Pass/FailThreshold or <br /> Criteria: 4,9 <br /> Test Result X_Pass 0 FailPas, 0 Fail 0 Pass 0 Fail 0 Pass CI Fail <br /> Commcats-Lhelude infurmation on repairs madeprior Io 1riling, and �Iv <br /> ear :an .6n n2 J4H <br />