Laserfiche WebLink
SW`RCB,January 2002 raga;7- or "a <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/0=511 Containment Boxes 0 <br /> Spill/Overfill Conta,inment Boxes are Present but were Not Tested U <br /> Test Method Developed By: f]Spill Bucket Manufacturer &Kdustry Standard 0 Professional Engineer <br /> 0 Other(Specif <br /> y) <br /> Test Method Used: 13 Pressure D Vacuum <br /> 0 Other(Specify) <br /> Test Equipment Used: )L Equipment Resolution: 01A. <br /> ... ... ... ... <br /> Spill Box N Spill Box N Spill*Box 4 Spill Box# <br /> Bucket Diameter. <br /> Bucket Depth: <br /> Wait time between applying <br /> pressuretvacuurri/water and <br /> S=ing test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: tz r <br /> -bange in Reading(P.F-R): <br /> "ass/Fail Threshold or <br /> 'riteria: <br /> rest Result; Pus D Fail 0 Pass: 0 Fail D Pass 0 Fail 0 Pass 0 Fail <br /> 20mmexiis-LnSlude yn(jrtwtjon on Egpink made Lirzor to testing, and rccommo���upfhrfafled tests) <br /> 7:C4�rgcr, tg&.1hy t, pyo-n,- Czo& A <br /> bid A t!±L <br /> 2110-6*,L (602) e22 :Bo io 02 jju <br />