Laserfiche WebLink
SWRCB,January 2002 page <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer UAlu—stry Standard 0 Professional Engineer <br /> 0 Other(•pecify) <br /> Test Method U%ed: F,?M711 u ro 0 Vacuum 11 Hydrostatic <br /> 1 0 Other(Specify) <br /> Test Equipment Used: Mirgag�t t 7 C-age Equipment Resolution: <br /> . ..... Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: 0 F rb E14 V I we <br /> Piping <br /> im <br /> Piping Diameter: <br /> L <br /> Piping Run. <br /> Piping <br /> of Pi77 I <br /> Product Stored: <br /> Method and location of <br /> gieing-run isolation: sra C <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Stan Time: 1,q j> <br /> Initial Reading(R�: <br /> Test End Time: <br /> 41—�— <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Rcading(RrRj): <br /> Pass/Fail Threshold or <br /> Criteria: /7,9 Acq15 Ave.& <br /> rest Result: afl jKP282 11 F20 0 Pass 0 Flail 0 Pass [I Fail <br /> :!ejuments—(include information on rapairy madepLor to lcetin and recommendedfollow-up.Lor&led tests) <br /> io. .d i'D 02 .add <br />