My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />2636(a)(1) <br />(1) Vent or tank riser piping, provided the primary containment system is equipped with an <br />overfill prevention system meeting the requirements specified in sections 2635(b)(2)(B) <br />or (C) <br />8. All equipment installed be shall third party approved. Equipment submitted were not all <br />third party approved. i.e. spill containment, fill caps, fill pipe adaptors, etc... <br />9. Submit APT piping cut sheets. <br />10. Submit certification statement of training for equipment to be installed. <br />11. Provide a layout of vent piping, include type of piping. <br />12. Indicate the location audible/visual. <br />13. Specify where ball valves will be installed <br />14. Specify how long the piping run be will. (product/vent/return) <br />15. Resubmit F-3 in the plans specifying what will and will not be done. <br />16. "Top Hat" or lid for the sump may not be compatible with the existing sump. Specify current <br />sump manufacturer. <br />17. Provide all cut sheets and applications in triplicate. <br />Thank you, <br />Dina Abate, EHS <br />Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.