Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Guage Equipment Resolution:0-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: Pisces Pisces <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run: 30' 30' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min 5 Min <br /> starting test: <br /> Test Start Time: 8:30 8:30 <br /> Initial Reading(RI): 5 PSI 5 PSI <br /> Test End Time: 9:00 9:00 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 30 Min 30 Min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 Drop 0 Drop <br /> Criteria: <br /> Test Residt: I x Pass G Fail ® Pm 0 Fail 1 ® Pass CI Fail D Pass ®Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />