My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Guage Equipment Resolution:0-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: Pisces Pisces <br /> Piping Diameter: 2" 2" <br /> Length of Piping Run: 30' 30' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min 5 Min <br /> starting test: <br /> Test Start Time: 8:30 8:30 <br /> Initial Reading(RI): 5 PSI 5 PSI <br /> Test End Time: 9:00 9:00 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 30 Min 30 Min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 Drop 0 Drop <br /> Criteria: <br /> Test Residt: I x Pass G Fail ® Pm 0 Fail 1 ® Pass CI Fail D Pass ®Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.