My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suggested specification for <br /> UL/ULC Listed Red Thread@ 11A Piping System <br /> 2.06 Acceptable Manufacturers. Fiber Glass 3.05.—Sump Penetrations. Sump penetrations shall <br /> Systems, Smith Fibercast, 501-618-2203, or approved be made by means of a permanently bonded FRP <br /> equal. coupling. The coupling shall be capable of adjusting <br /> for the slope of the piping system entering or exiting <br /> Section 3-WAte W and Con truction the sump wall. <br /> 3.01 2"-A" <br /> 311-4" <br /> The pipes all be manufactured by the 3.06 Adhesives. Adhesives shall be manufacturer's <br /> filament winding process using an amine cured standard for the piping system specified. <br /> epoxy thermosetting resin to impregnate strands of <br /> continuous glass filaments, which are wound around 3.07 Acceptable Products, RED THREAD IIA <br /> a mandrel at a 54314" winding angle under controlled Piping System as manufactured by FGS Smith <br /> tension. The pipe shall be heat cured and the cure Fibercast or engineered approved equal. <br /> shall be confirmed using a Differential Scanning <br /> Calorimeter. <br /> Pipe shall be supplied with T.A.B. (Threaded and SECTION 4-instillUA on and Testina <br /> Bonded)or plain ends. All joints installed <br /> ! Pipe shall have a minimum continuous cyclic or constructed in the field shall be assembled by <br /> pressure rating of 125 psig at 150°F in accordance employees of the contractor who have been trained by <br /> with ASTM D2992, Procedure A or UL 971 pressure the pipe manufacturer. The pipe manufacturer or their <br /> rating. authorized representative, shall train the contractor,s <br /> employees in the proper joining and assembling <br /> All pipe, both primary and secondary, shall be procedures required for the project, including hands- <br /> 100% hydrotested at the factory before shipment at a on participation by the contractor's employees. Each <br /> minimum pressure of 265 psig and shall be UL 971- bonder shall fabricate one pipe-to-pipe and one pipe- <br /> 2004 Listed and Labeled. to-fitting joint that shall pass the minimum pressure <br /> test for the application as stated in Section 2.03 <br /> 3.02 ASTM D23-10 Classifications,(at73.4°f) without leaking. <br /> Primary Pine Secondary Pipe Only bonders that have successfully completed <br /> 2"-3" RTRP-11AF 3" RTRP-11AF the pressure test shall bond pipe and fittings. Each <br /> bonder shall carry a current, manufacturer proof of <br /> 410 RTRP-11AH 4" RTRP-11AH training card. <br /> (Mechanical properties cell classifications shown are <br /> minimums.) 4.02 Pipe Installation. Pipe shall be installed as <br /> specified and indicated on the drawings. <br /> 3.03 Flttinas. All fittings shall be manufactured using The piping system shall be installed in accordance <br /> the same type of material as the pipe. Fittings may be with the manufacturer's current published installation <br /> manufactured either by compression molding,filament procedures. <br /> winding, resin transfer molding or contact molding <br /> methods. All fittings, adapter, and sump penetrations <br /> shall be UL971-2004 Listed. 4.03 Testing. A hydrotatie pressure test shall be <br /> Primary fittings shall be adhesive bonded,matched conducted on the completed piping system. The <br /> tapered bell and spigot and rated the same as the piping system shall be subjected to 10 pressurization <br /> pipe. cycles from 0 psig to 1.5 times the design operating <br /> pressure as stated in Section 2.03.c. After the 10 <br /> Secondary containment fittings shall be two-piece cycles, the pressure shall be held on the system for a <br /> style to allow for 100% inspection of the primary joint minimum of 1 hour and the line inspected for leaks. <br /> pressure test and be rated to a minimum of 50 psig Test pressures shall not exceed 1.5 times the <br /> per UL 971-2004. maximum rated pressure of the lowest rated element <br /> Should hydrostatic testing be impractical, testing in the system. <br /> with low pressure air or inert gas may be acceptable. <br /> Extreme caution should be used when testing All i e Dints shall be water tight. All Dints that are <br /> with air. Follow all safety precautions and testing pdp 1 9 j <br /> recommendations of the pipe manufacturer. four to leak, by observation or during testing shall be <br /> replaced by the contractor and retested. <br /> 3.04 Connections. Connections to flex connectors Should hydrostatic testing be impractical, testing with <br /> i or other piping materials shall be made b the use y 9 p g <br /> of NPT (National Pipe Thread) threaded adapters or low pressure air or inert gas may be acceptable. <br /> flanges bonded to the FRP piping system. Extreme caution should be used when testing <br /> with air. Follow all safety precautions and testing <br /> recommendations of the pipe manufacturer. <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.