Laserfiche WebLink
Suggested specification for <br /> UL/ULC Listed Red ThreadO IIA Piping System <br /> SECTION 4-instal Ilan and Testing Secon >raty Containment Piping <br /> 4.01 Training and Certification. All joints installed <br /> or constructed in the field shall be assembled by SECTION I e SQ2129 <br /> employees of the contractor who have been trained by This section covers the use of fiberglass reinforced <br /> the pipe manufacturer. The pipe manufacturer or their plastic (FRP) pipe for fuel handling and fuel handling <br /> authorized representative shall train the contractor's vent and vapor applications including gasoline, <br /> employees the proper joining project, <br /> and assembling unleaded gasoline, gasoline/alcohol mixtures, b{o- <br /> on participation by the contractors employees. Each <br /> procedures required for the project, including hands- diesel and diesel that require secondary containment. <br /> bonder shall fabricate one pipe-to-pipe and one pipe- <br /> to-fitting joint that shall pass the minimum pressure AM=2- General Conditions _ <br /> test for the application as stated in Section 2.03 2.01 Coordination. Material furnished and work <br /> without leaking. performed under this section shall be coordinated with <br /> Only bonders that have successfully completed the related work and equipment specified under other <br /> the pressure test shall bond pipe and fittings. Each sections, i.e.Valves, Flexible Connectors, Equipment. <br /> bonder shall carry a current manufacturer's proof of <br /> training card. 2.Q2 Governing Stand,;t,Lds. Except as mofidifed or <br /> 4.02 Pine InsiallOtiQn. Pipe shall be installed as supplemented herein, all materials and construction <br /> specified and indicated on the drawings. methods shall comply with and be tested in <br /> The piping system shall be installed in accordance accordance with the following standards and test <br /> with the manufacturer's current published installation methods: <br /> procedures. Standards and Test Methods: <br /> 4.03 Testing` A hydrotatic pressure test shall be UL971-2004 Standard for Nonmetallic <br /> conducted on the completed piping system. The Underground Piping for Flammable <br /> piping system shall be subjected to 10 pressurization Liquids <br /> cycles from 0 psig to 1.5 times the design operating ASTM D2310 Standard Classification f o r <br /> pressure as stated in Section 2.03.c. After the 10 ac <br /> Mhine-Made "Fiberglass" Glass <br /> cycles, the pressure shall be held on the system fora 9 <br /> Fiber Reinforced Thermosetting <br /> minimum of 1 hour and the line inspected for leaks. <br /> Test pressures shall not exceed 1.5 times the Resin)Pipe <br /> maximum rated pressure of the lowest rated element ASTM D2992 Standard practice for obtaining <br /> in the system. Hydrostatic or Pressure Design Basis <br /> All pipe joints shall be water tight. All joints that for "Fiberglass" (Glass Fiber Reinf- <br /> are found to leak, by observation or during testing, orced Thermosetting Resin) Pipe and <br /> shall be replaced by the contractor and retested. Fittings <br /> Should hydrostatic testing be impractical, testing 2,03 Operating Conditions. In addition to the <br /> with low pressure air or inert gas may be acceptable. , <br /> Extreme caution should be used when testing above listed minimum design requirements, the <br /> with air. Fallow all safety precautions and testing system shall meet the following minimum operating <br /> recommendations of the pipe manufacturer. conditions: <br /> a. Operating-Pressure <br /> b. Fluid Conveyed <br /> c. Test Pressure <br /> 2.04 Quality Assurance. Pipe manufacturer's <br /> quality program shall be in compliance with ISO 9001 <br /> and/or API 01. <br /> Pipe and <br /> fittings shall be protected from damage L to impact <br /> and point loadingPipe shall be properly supported to <br /> avoid damage du.e to flexural strain. The contractor <br /> shall not allow dirt, debris or other extraneous <br /> materials to get into pipe and fittings. All factory <br /> machined areas shall be protected from sunlight until <br /> installed. <br /> F <br />