My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> Michelle Henry [EH] <br /> From: Michelle Henry [EH] <br /> Sent: Thursday, December 27, 2007 8:13 AM <br /> To: 'Dejan Ristic' <br /> Subject: RE: Lodi Memorial Hospital Plan Check <br /> Dejan, <br /> Thanks for the quick response. Please provide the exact part number for the spillbucket you will be using. I also <br /> need UL, ULC or 3rd party listing information for all tanks, piping and equipment, i.e. monitoring equipment, <br /> overspill containment device, overfill protection device, dispenser pan, etc. that will be used for this project. <br /> Thanks <br /> Michelle <br /> From: Dejan Ristic [mailto:dejanr@westernpump.com] <br /> Sent: Wednesday, December 26, 2007 12:06 PM <br /> To: Michelle Henry [EH] <br /> Cc: Hopper, Dave; Diana Sanchez; Ryan Rethmeier; Mark Bridgwater; Michael Mizicko; John Borchardt <br /> Subject: RE: Lodi Memorial Hospital Plan Check <br /> Hello Michelle: <br /> It was a pleasure talking with you earlier today. Thanks for your help. <br /> 1. Please refer to our drawing GP-00 UST EQUIPMENT LIST, Sym 25: Veeder-Root <br /> Sensor No. 794380-303 is, in deed, a dual-point hydrostatic sensor for DWT6 <br /> tank and is the actual unit we will be installing for tank interstitial space <br /> monitoring (I am attaching Veeder Root Manual No. 576013-795, p. 3 for your <br /> reference) . <br /> I hope this addresses the sensor issue. <br /> 2. OPW 511 - Sorry for the confusion as we mistakenly inserted Series 700 cut <br /> sheet. Attached please find the 500 Series information. Attached please find <br /> correct cut sheet - we intend to use single port configuration. <br /> Please let me know if either of the above requires more information or <br /> clarification. <br /> 3. In regards to the existing tank please note that we have just been advised <br /> by our general contractor that the existing tank is being used for the current <br /> central plant and will remain on-line. The existing lines will not connect to <br /> the new system. <br /> Thank you very much for giving us advance information on any adjustments <br /> needed in the plans as this will contribute in making sure that we address all <br /> issues and reduce the time needed to process the plan check. Should you <br /> notice any other issues please let us know so that we can take care of them <br /> and, hopefully, have the plan check approved as soon as possible. <br /> Thank you very much for trying to expedite. <br /> 1/28/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.