Laserfiche WebLink
Page 1 of 2 <br /> t <br /> Michelle Henry [E ] <br /> From: Dejan Ristic[dejanr@westernpump.com] <br /> Sent: Friday, January 18, 2008 12:25 PM <br /> To: Michelle Henry[EH] <br /> Subject: RE: Lodi Memorial UST Install-Coordination Meeting on 1/22; Buoyancy Calc Stamp Drawing <br /> Thank you very much, Michelle. I 've already left a voice mail for Mr. Kravis so <br /> that he can give me the status on the Super Smartflex information. I will urge him <br /> to give this to you as soon as possible. <br /> For Tuesday meeting purposes plese note that HMH has recently moved their office <br /> trailers to 1000 S Fairmont, Lodi, CA, and that is where we will be meeting. I <br /> just found out so I wanted to make sure you knew as well. <br /> Best Regards, <br /> Dejan Ristic <br /> Western Pump, Inc. <br /> 3235 "F" Street <br /> San Diego, CA 92102-3315 <br /> Office: 619.578.2193 <br /> Cell: 619.446.9043 <br /> Fax: 619.236.7406 or 239.9925 <br /> From: Michelle Henry [EH] [mailto:m hen ry@sjcehd.com] <br /> Sent: Friday, January 18, 2008 8:09 AM <br /> To: Dejan Ristic <br /> Subject: RE: Lodi Memorial UST Install-Coordination Meeting on 1/22; Buoyancy Calc Stamp Drawing <br /> Dejan, <br /> Sounds good. I did in fact receive the stamped buoyancy calcs but have not received information regarding <br /> Super Smartflex Pipe. <br /> Michelle <br /> From: Dejan Ristic [mailto:dejanr@westernpump.com] <br /> Sent: Thursday, January 17, 2008 4:30 PM <br /> To: Michelle Henry [EH] <br /> Cc: Hopper, Dave; Diana Sanchez; Michael Mizicko; John Borchardt; Ryan Rethmeier <br /> Subject: Lodi Memorial UST Install-Coordination Meeting on 1/22; Buoyancy Calc Stamp Drawing <br /> Hello Michelle- <br /> Per my voice mail of this morning, I hope that you are already in possession <br /> of the the stamped drawing (page) with the buoyancy calculations. <br /> I hope that by now Mr. Kravis of Nupi has sent you information on Super <br /> SmartFlex Nupi pipe that you discussed on the phone. <br /> As for our meeting on Tuesday, 1/22 between 10-11 am (approximately) on site <br /> at 975 S Fairmont Avenue, Lodi, everything has been scheduled per my e-mail of <br /> 1/9: representatives of HMH (general contractor) , our client (KMS, who are the <br /> 1/22/2008 <br />