My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 09-04-'08 10:19 FROM-Western Pump, Inc. 619-236-7406 T-530 P016/019 F-786 <br /> 0 <br /> Fib <br /> Bulletin 82102 <br /> arass May 1,2006 <br /> STAR • SMITH • a ISERCAS'r <br /> UL/ULC Listed Red Thread®II A Piping System <br /> General Specifications <br /> f71I'1aty Piping <br /> SECTION 1-Scope <br /> This section covers the use of fiberglass reinforced machined areas shall be protected from sunlight until <br /> plastic (FRP) pipe for single wall fuel handling and installed. <br /> fuel handling vent and vapor applications including 2.06 Accaptable Manufacturers. Fiber Glass <br /> gasoline, unleaded gasoline, gasoline/alcohol Systems, Smith Fibercast, 501618-2203, or approved <br /> mixtures, bio-diesel and diesel up to 150°F and 250 equal, <br /> psig cyclic pressure. <br /> Section 3-Material and Construction <br /> SACT/ON 2- General Conditions 3.0J 2%4" pipe The pipe shall be manufactured by <br /> 2.01 Coordination, Material furnished and work the filament winding process using an amine cured <br /> performed under this section shall be coordinated with epoxy thermosetting resin to impregnate strands of <br /> the related work and equipment specified under other continuous glass filaments, which are wound around <br /> sections, i.e.Valves, Flexible Connectors, Equipment. a mandrel at a 543/4" winding angle under controlled <br /> tension. The pipe shall be heat cured and the cure <br /> 2.02 Governing Standards. Except as mofidifed or shall be confirmed using a Differential Scanning <br /> supplemented herein, all materials and construction Calorimeter. <br /> methods shall comply with and be tested in Pipe shall be supplied with a T.A.B.TM (Threaded <br /> accordance with the following standards and test and Bonded) ends. <br /> methods: Pipe shall have a minimum continuous cyclic <br /> Standards and_lest Methods pressure rating of 125 psig at 160°F in accordance <br /> UL971-2004 Standard for Nonmetallic with ASTM D2992, Procedure A or UL 971 pressure <br /> Underground Piping for Flammable rating. <br /> Liquids All pipe shall be 100% hydrotested at the factory <br /> ASTM D2310 Standard Classification for Machine- before shipment at a minimum pressure of 265 psig <br /> Made "Fiberglass" (Glass Fiber and shall be UL971-2004 Listed and labeled. <br /> Reinforced Thermosetting Resin) 3.02 ASTM 02310 Classifications (at 73.4°F) <br /> Pipe 211 -311 RTRP-11 AF <br /> ASTM D2992 Standard practice for obtaining 4" RTRP-1IAH <br /> Hydrostatic or Pressure Design Basis (Mechanical properties cell classifications shown are <br /> for Fiberglass (Glass Fiber Reinf- minimums.) <br /> orced Thermosetting Resin) Pipe and 3.03 Fittings. All fittings shall be manufactured <br /> Fittings g <br /> using the same type of material as the pipe. Fittings <br /> 2.03 Qraeratina Conditions. In addition to the may be manufactured either by compression molding, <br /> above listed minimum tigndesign requirements,dditio o the filament winding, resin transfer molding or contact <br /> molding methods. All fittings, adapter, and sump <br /> system shall meet the following minimum operating penetrations shall be UL971-2004 Listed. <br /> conditions: Fittings shall be adhesive bonded matched tapered <br /> a. Operating Pressure bell and spigot. <br /> b. Fluid Conveyed 3.04. Connections. Connections to flex connectors <br /> c. Test Pressure or other piping materials shall be made by the use <br /> of NPT (National Pipe Thread) threaded adapters or <br /> 2.04 Quality Assurance, Pipe' manufacturer's flanges bonded to the FRP piping system. <br /> quality program shall be in compliance with ISO 9001 3.05_ Sump Pgngt.ratian4. Sump penetrations shall <br /> and/or API Q1. be made by means of a permanently bonded FRP <br /> coupling. The coupling shall be capable of adjusting <br /> 2.05 ®slivery. Storarend Handling. Pipe and for the slope of the piping system entering or exiting <br /> the sump wall. <br /> fittings shall be protected from damage due to impact <br /> and point loading. Pipe shall be properly supported to tar Adhesives. Adhesives shall be manufacturer's <br /> s <br /> avoid damage due to flexural strain. The contractor standard for the piping system specified. <br /> shall not allow dirt, debris or other extraneous 3.07 Acceptable Products, RED THREAD IIA <br /> materials to get into pipe and fittings. All factory Piping System as manufactured by FGS Smith <br /> Fibercast or engineered approved equal. <br /> 0 Trademark of Varco UP,Inc. FIBER GLASS SYSTEMS-A NATIONAL OiLWELL VARCO COMPANY <br /> http:lAvWW.smithfibercast.com 2700 W.65th ST,LITTLE ROCK,AR 72208.501-568-4010•FAX 501-568-4465 <br /> 25 S.MAIN ST„SAND SPRINGS,OK 74063.918-245-6651 •FAX 918.2457566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.